[1] Berg R C,Mathers S J,Kessler H, et al.Synopsis of Current Three-dimensional Geological Mapping and Modeling in Geological Survey Organizations[R/OL].Champaign:Ilinois State Geological Survey,[2014-05-06].http://library.isgs.uiuc.edu/Pubs/pdfs/circulars/c578.pdf.[2] Mathers S J,Terrington R L,Waters C N, et al.GB3D-a Framework for the Bedrock Geology of Great Britain[J].Geoscience Data Journal,2014,1(1):30-42.
[3] 屈红刚,潘懋,明镜,等.基于交叉折剖面的高精度三维地质模型快速构建方法研究[J].北京大学学报:自然科学版,2008,44(6):83-88.
[4] Kaufmann O,Martin T.3D Geological Modelling from Boreholes, Cross-sections and Geological Maps, Application over Former Natural Gas Storages in Coal Mines[J].Computers & Geosciences,2008,34(3):278-290.
[5] 屈红刚,潘懋,刘学清,等.城市三维地质建模及其在城镇化建设中的应用[J].地质通报,2015,34(7):1350-1358.
[6] 陈忠良,童劲松,吴雪峰,等.安徽运漕地区隐伏地质体三维模型构建及应用[J].资源调查与环境,2015,36(2):123-129.
[7] Tacher L,Pomian-Srzednicki I,Parriaux A.Geological Uncertainties Associated with 3-D Subsurface Models[J].Computers & Geosciences,2006,32(2):212-221.
[8] Bistacchi A,Massironi M,Piaz G V D, et al.3D Fold and Fault Reconstruction with an Uncertainty Model: An Example from an Alpine Tunnel Case Study[J].Computers & Geosciences,2008,34(4):351-372.
[9] 陈国良,朱良峰,刘修国.三维地质结构建模中交叉剖面一致性检校方法[J].信阳师范学院学报:自然科学版,2009,22(3):92-95.
[10] Royer J, Shtuka A.Stochastic Imaging of Environmental Data,Geosciences and Water Resources: Environmental Data Modeling[M].Berlin, Germany:Springer,1997:101-114.
[11] Mallet J L.Discrete Smooth Interpolation in Geometric Modelling[J].Computer-Aided Design,1992,24(4):178-191.
[12] Aug C,Chilès J P, Courrioux G, et al.3D Geological Modelling and Uncertainty: The Potential-field Method[J]. Quantitative Geology and Geostatistics,2005,14(1):145-154.
[13] Lark R M,Thorpe S,Kessler H, et al.Interpretative Modelling of a Geological Cross Section from Boreholes: Sources of Uncertainty and their Quantification[J].Solid Earth,2014,5(2):1189-1203.
[14] Lark R M,Mathers S J,Thorpe S, et al.A Statistical Assessment of the Uncertainty in a 3-D Geological Framework Model[J].Proceedings of the Geologists Association,2013,124(6):946-958.
[15] 朱良峰,吴信才,潘信.三维地质结构模型精度评估理论与误差修正方法研究[J].地学前缘,2009,16(4):363-371.
[16] 徐华,武强,李坤,等.三维地质模拟中不确定性分析方法[J].系统仿真学报,2012,24(4):837-842.
[17] 陈忠良,童劲松,包海玲.浅覆盖区第四系三维地质结构模型快速构建——以运漕幅为例[J].安徽地质,2013,23(2):42-46.
[18] Lelliott M R,Cave M R,Wealthall G P. A Structured Approach to the Measurement of Uncertainty in 3D Geological Models[J].Quarterly Journal of Engineering Geology and Hydrogeology,2009,42(1):95-105.
[19] Lark R M,Mathers S J,Marchant A, et al.An Index to Represent Lateral Variation of the Confidence of Experts in a 3-D Geological Model[J].Proceedings of the Geologists Association,2014,125(3):267-278.
[20] 南京地质调查中心.江南陆块及周缘地质矿产调查工程简介[J].华东地质,2016,37(1):73-75.
[21] 杨明桂,王光辉,徐梅桂,等.江西省及邻区滨太平洋构造活动的基本特征[J].华东地质,2016,37(1):10-18.
[22] 陈建平,李婧,崔宁,等.大数据背景下地质云的构建与应用[J].地质通报,2015,34(7):1260-1265.
[23] 赵鹏大.大数据时代数字找矿与定量评价[J].地质通报,2015,34(7):1255-1259.